DDU-GKY Batch Wise Details

Disclaimer:
  • The report is generated based on data available in Kaushal Bharat as of 28-Apr-2025.Please note that migration of legacy data is still in progress and you may observe some deviations because of that.Please let us know at in case you observe any differences
  • Kaushal Bharat portal is facilitating the data / numbers updated by SRLMs/ PIAs. Ownership of the data lies with respective State SRLM.
S.No. StateName Sanction Order PIA TC Name Batch Batch Start
Date
Batch End
Date
Batch
Size
Candidate
Enrolled
Candidate
Freezed
Trained Dropout Undergoing Assessed Certified Appointed Monthly Continuity
(min. 3 months)
Placed
1 ANDHRA PRADESH J-17011/01/2015-DDU-GKY/16 SEEDAP EGM AP VISHWASAMUDRA ENGINEERING PVT LTD 1104748 2024-09-09 2025-01-11 30 30 30 21 9 0 0 0 0 0 0
2 ANDHRA PRADESH J-17011/01/2015-DDU-GKY/16 SEEDAP EGM AP VISHWASAMUDRA ENGINEERING PVT LTD 1099190 2023-11-02 2024-03-07 30 30 30 30 0 0 30 30 30 30 30
3 ANDHRA PRADESH J-17011/01/2015-DDU-GKY/16 SEEDAP EGM AP VISHWASAMUDRA ENGINEERING PVT LTD 1104771 2024-09-25 2025-02-02 30 30 30 24 6 0 0 0 0 0 0
4 ANDHRA PRADESH J-17011/01/2015-DDU-GKY/16 SEEDAP EGM AP VISHWASAMUDRA ENGINEERING PVT LTD 1101657 2024-03-06 2024-07-22 30 30 30 29 1 0 29 29 29 29 29
5 ANDHRA PRADESH J-17011/01/2015-DDU-GKY/16 SEEDAP EGM AP VISHWASAMUDRA ENGINEERING PVT LTD 1099189 2023-11-02 2024-02-29 30 30 30 30 0 0 30 30 29 29 29
Total 150 150 134 16 0 89 89 88 88 88

2025 © Designed and Developed by NIRDPR HYDERABAD.